Our project in Princeton is moving along, and we are finally able to walk around the site without the endless frozen un-walkable mud or shoe grabbing liquid mud. The site is now mostly graded and the gravel drive is partially installed. Not a puddle of mud in sight:

CA-033

That wall of polycarb. panels should glow nicely at night.

The living room is shaping up to be a spectacular space with views of the south & west forest:

CA-006

CA-008

The stairwell now has the skylights installed and the raking light is quite effective on the existing barn siding:

CA-012

The south yard and prow so far. The posts are temporary. Did I mention how pleasant it is to walk the site sans-mud?:

CA-022

CA-027